Endline Evaluation of PROTECT Project
SWN is a Local Research Partner for Global Insight (https://www.g-insight.org/), US from 2021 for evaluating the Plan USA-sponsored PROTECT (Prevention, Tracking, Education and Transformation) program in Nepal. The project supports children, families,...
Mitigation of Landslides using Nature-Based Solutions (NbS)
Introduction Landslides are complex phenomena, and are increasingly visible as human activities trigger them more in Nepal than natural slope adjustment processes. To mitigate the landslide risks it is important to recognize the associated...
Study on Nepal’s E-Governance Landscape
Ongoing Project, July- December 2023 Under USAID’s Swift Expertise and Grounded Analytics (SEGA) Mechanism, DevTech Systems, Inc., provides USAID/Nepal with analytical and facilitation support to elevate the inclusive use of E-governance tools...
Final Evaluation of Integrated Comprehensive Recovery Program Phase 3 in Thangpal Valley – Sindhupalchok
Ongoing Project, September- November 2023 The France-based INGO, the Triangle Generation Humanitaire (TGH) has awarded SWN to undertake an external evaluation of its third phase of the Integrated Global Reconstruction Project (IGRP) project...
Nature-based Solution (NbS) to mitigate soil erosion and slope instability at Chaku-Marming Road, Bhotekosi.
Bhotekoshi Rural Municipality (RM) officials seek to mitigate soil erosion and slope instability issues at Chaku-Marming Road at Chainage 0+600 Km, Bhotekoshi-4. To support the RM, bio-engineering measures were demonstrated as a Nature-based Solution for slope...
Application of Nature-based Solution (NbS) for Slope Stabilization
A demonstration event on the application of bio-engineering for slope stabilization and landslide mitigation was held in Lamchedhunga, Uttargaya-2, Rasuwa on July 12-13, 2023, under the EU Humanitarian Aid funded Pratibaddha project. The event was helpful to raise...
Demonstrating Bio-engineering for Slope Stabilization- Naukunda Rural Municipality
A demonstration event on bio-engineering for slope stabilization and landslide mitigation was held in Naukunda Gaunpalika, Rasuwa on June 22, 2023, under the EU Humanitarian Aid-funded Pratibaddha project. The Bio-engineering Specialist Mr. Shankar Rai demonstrated...
Pratibaddha support to review and revise DPRP and formulate Forecast based Action (FbA)Procedure
With the support of the EU Civil Protection & Humanitarian Aid, the Pratibaddha-2 Project has assisted Bahrabise Municipality and Bhotekoshi Rural Municipality in reviewing and revising their Disaster Preparedness and Response Plan (DPRP). Both DPRPs have now...
Outcome Monitoring Survey of the Motorable Local Roads Bridge Programme (MLRBP) Phase IV
Ongoing Project, June 2023 SWN is delighted to announce that we will once again be leading the Outcome Monitoring Survey (OMS) of the Motorable Local Roads Bridge Programme (MLRBP) Phase IV. This time, SWN will carry out OMS in 21 bridges...
End-of-Project Evaluation of the “Safer, Healthier and More Resilient Communities in Rasuwa District of Nepal”
Ongoing Project, June 2023 SWN is delighted to announce that Islamic Relief Worldwide Nepal has awarded us to carry out an end-of-project evaluation of the "Safer, Healthier and More Resilient Communities in Rasuwa District of Nepal" project....